Enter the length, width and depth of each slab or footing, or the diameter and depth of each post hole or column. Get cubic metres with waste, and either ready-mix bags or the cement, sand and aggregate for a chosen mix ratio.

Units
Slabs and footings
Element 1
Post holes and columns
Supply
Supply

You need

  • 113bags
Volume
1.2 m³
Waste
10 %
Volume incl. waste
1.32 m³
How this was calculated
  1. Volume with waste1.2 m³ × (1 + 10 %) = 1.32 m³
  2. Bags1.32 m³ ÷ 0.0117 m³ = 112.82 → 113

Results are estimates. Always check the coverage figures printed on your own product before buying.

Guide

How the concrete calculator works

Concrete is a volume calculation followed by a conversion to whatever you can buy: bags of ready mix, or cement, sand and aggregate for mixing on site.

  1. Volume. Length × width × depth for each slab or footing, and π ÷ 4 × diameter² × depth for each post hole or column, times the count, added up.
  2. Waste. A default 10 % for uneven ground and spillage.
  3. Bags. Volume with waste ÷ yield per bag, rounded up. Enter the yield from your bag: 25 kg gives about 11.7 litres.
  4. Site mix. Volume × 1.54 gives the dry material. It is split by the mix ratio; cement volume × 1440 kg/m³ gives kilograms and whole bags, while sand and aggregate are reported in cubic metres and approximate kilograms.

Measuring slabs and footings

For a slab, measure the length and width of the formwork and the thickness of the slab, not the excavation. For a strip footing, use the length of the trench, its width and the depth of concrete. For post holes and round columns, enter the diameter of the hole or column and its depth or height in the second list; the post itself displaces very little, so do not subtract it. Enter a count for repeated elements.

Bags or ready mixed?

Bagged concrete is convenient up to about 0.5 m³, which is around 43 bags of 25 kg. Beyond that, mixing on site from cement, sand and aggregate is cheaper, and beyond 2 to 3 m³ a ready-mixed delivery is usually cheaper still and far quicker. Use the site-mix option to size a delivery of sand and aggregate; the cubic metres and approximate weights are what the merchant will ask for.

Imperial units

Switch to imperial to enter feet and inches, with bag yields in cubic feet and the result in cubic yards. The calculation is done in cubic metres behind the scenes.

Worked example

A 4 × 3 m patio slab 100 mm thick is 1.2 m³. With the default 10 % waste that is 1.32 m³. In 25 kg bags yielding 11.7 litres each, that is 112.8 bags, so 113 bags, which is a clear sign to mix on site or order a delivery instead. As a 1:2:4 site mix, the 1.32 m³ needs 2.03 m³ of dry material: 0.29 m³ of cement, which is 418 kg or 17 bags of 25 kg, plus 0.58 m³ of sand and 1.16 m³ of aggregate. Those two volumes are what you order from the builders’ merchant.

Frequently asked questions

How do I calculate concrete volume in cubic metres?

Convert every measurement to metres first (100 mm is 0.1 m), then multiply length × width × depth. A 3 × 2 m slab 100 mm thick is 3 × 2 × 0.1 = 0.6 m³. For a round post hole, use 0.785 × diameter² × depth: a 300 mm hole 600 mm deep is 0.785 × 0.09 × 0.6 = 0.042 m³, about 42 litres. Add 10 % for waste.

How many bags of ready-mix concrete make a cubic metre?

About 86 bags of 25 kg, 107 bags of 20 kg or 72 bags of 30 kg, based on typical yields of 11.7, 9.4 and 14 litres per bag. With 10 % waste, 1 m³ needs 95 bags of 25 kg. At that size, a site mix or a ready-mixed delivery is usually cheaper.

How much concrete does a 25 kg bag make?

About 11.7 litres (0.0117 m³) of concrete. A 20 kg bag gives about 9.4 litres, a 30 kg bag about 14, and a US 80 lb bag about 0.6 cubic feet. Check the yield on your bag; the calculator uses whatever you enter.

What mix ratio should I use?

1:2:4 (cement:sand:aggregate) is the general-purpose mix for slabs and paths. 1:2.5:3.5 is common for foundations, 1:1.5:3 for stronger structural work, and 1:3:6 for lean blinding concrete.

Why does the site mix need more than one cubic metre of dry material per cubic metre of concrete?

Loose sand and aggregate have air between the grains. When mixed with cement and water they pack down by about a third, so 1 m³ of concrete needs about 1.54 m³ of dry ingredients.

How much waste should I add?

Ten percent covers uneven sub-bases, spillage and what stays in the mixer. For a rough excavated footing use 15 to 20 percent because the sides are never straight.